Apologies, but no results were found. Perhaps searching will help find a related post.
TUTEKA was selected to carry out the engineering, prefabrication and installation of an elliptical, spiral stairway.
More
TUTEKA was given seven months’ time to manufacture and install, with respect for the vision of the architect, the canopies for the extension of the iconic Burj Al Arab.
More